2. Mobile Calendar Testing
This was the third Mobile Calendaring Interoperability test event. The primary focus was Activesync and the CalConnect Mobile Calendar Interoperability Test suite was used as the basis for testing. A copy of the test suite can be found in the resources section of the CalConnect website.
The test suite is quite large. In order to ensure we tested as much as possible during the three days, a subset of the test suite was chosen. A testing matrix was used as a guide and to record findings. In addition, a matrix of tested components was used to record results. A completed test matrix with the results from all testing vendors is included at the end of this report.
The testing included calendar (vEvent), tasks (vTodo) and contacts (vCard). The number of items tested was as follows:
Calendar Test Results | # of test cases |
Easy | 24 |
Medium | 42 |
Hard | 17 |
Total calendar tests | 83 |
Task Test Results | 14 |
Contact Test Results | 14 |
Total of all tests | 111 |